Roads and Bridges

The infrastructure builds.

  • 22 Tracked terms
  • Last 30 days Feed window

What this topic collects on

An article joins this feed when it matches these terms. Each one is also a search of its own.

Latest in Roads and Bridges

Rough Draft Atlanta
roughdraftatlanta.com > 08/28/2026 > brookhaven-bridge-meeting-chaos

Southern Bridge Connector project meeting becomes contentious

2+ week, 1+ day ago   (328+ words) Despite Brookhaven city officials’ call for civil discourse, attendees at a community meeting on Aug. 26 about the proposed Southern Connector Bridge over I-85 turned into a free-for-all, with attendees flinging accusations and shouting over each other. The Southern Connector Bridge…...

WSB-TV Channel 2 - Atlanta
wsbtv.com > news > trending > small-plane-makes-emergency-landing-ocean-off-florida-coast > SFQ3N4NWPBGCRIWCFR6SWINONU

Small plane makes emergency landing in ocean off Florida coast

2+ week, 5+ day ago   (23+ words) A Piper PA30 twin-engine plane crashed into the ocean off Florida's coast on Aug. 22. The solo pilot survived without injury....

Appen Media
appenmedia.com > milton > new-signal-set-for-crabapple-green-intersection-in-milton > article_55dcbeca-dbe9-48a7-ab43-06ca535ee7c4.html

New signal set for Crabapple-Green intersection in Milton

3+ week, 3+ day ago   (200+ words) An electronic message board along Crabapple Road alerts drivers to the upcoming activation of a new traffic signal at the thoroughfare’s intersection with Green Road. MILTON, Ga. — A new traffic signal at the intersection of Crabapple and Green roads should…...

Appen Media
appenmedia.com > alpharetta_roswell > roswell-area-park-resurfacing-work-set-for-aug-17-21 > article_586074f8-78a0-4bf8-a8bc-504507e2020f.html

Roswell Area Park resurfacing work set for Aug. 17-21

3+ week, 6+ day ago   (126+ words) A graphic shows planned resurfacing work at Roswell Area Park. ROSWELL, Ga. — The city of Roswell will resurface Roswell Area Park, 10495 Woodstock Road, beginning Aug. 17 and continuing through Aug. 21. Resurfacing is scheduled between the hours of 10:30 p.m. and 5:30 a.m., which…...